NAVRO club house construction 35
Alblasserdam, 24 February, 2008 - Sunday 27 January the first of two signs was mounted on the side of the club house nearest to our gate. Both signs were donated by "LV Belettering", who has recently done our new flag and T-shirts. After Elco Lagendijk and Pleun Punt had carefully measured where the holes should be drilled, the holes were drilled and the sign was mounted with some assistance of Gerben-Jan Ligthart.
Almost a month later on 24 February the second sign was mounted on the wall next to the front door. This time Fred van Arkel and Pleun Punt mounted the sign. Meanwhile Gerben-Jan Ligthart cleaned up, as usual on Sundays and some stuff was moved from the workshop to our storage container.
Sunday 27 January Elco Lagendijk measures the spot for a drill hole in the NAVRO sign.
He then drilled the holes.
After the sun went down he mounted the sign on the NAVRO club house assisted by Gerben-Jan Ligthart and Pleun Punt.
The sign on the side of the club house nearest to our gate.
While we haven't done much work on the club house lately, we keep doing small jobs like mounting these broom clips.
Sunday 24 February we finally had time to mount the second sign. Here Fred van Arkel drills holes in the sign.
Meanwhile Gerben-Jan Ligthart cleaned up the workshop and moved some things to the container.
Pleun Punt secured the sign to the wall with screws.
Both signs.
The last job of the day was cleaning the deep-frying pan and refilling it with clean fat.






