NAVRO club house construction 27

Alblasserdam, 19 August, 2007 - Tuesday evening 14 August the last paint went on the bar. Wednesday evening we packed our stuff at our old location, because the bar was painted the day before and had to dry. Several dozen boxes were packed and almost a third of our stuff went in the trashcan. Thursday evening Peter Heeren and Pleun Punt applied a first coat of varnish on the bar. Friday Peter Leemker and Pleun Punt applied a second coat of varnish to the bar. Pleun Punt attached a towel hook to the wall of the toilet and Peter Leemker waxed the workshop's floor.

Sunday much work was done. Fred van Arkel continued with the extra worktop for the kitchen. He routed a nice curved corner onto it and painted it. Pleun Punt worked with his favourite material: filler to repair damaged parts of the walls, mostly around the recently tiled corner of the kitchen. Pleun Punt tried to silence the ventilation in the kitchen by taping over its seems with duct tape. We jacked up the workbench and placed a support under its legs, as they were just between two floor beams and the floor between was sagging. Pleun Punt also made a hole in the bar for the refrigerators' flexes. Peter Leemker finished mounting the emergency lightings and applied adhesive labels to them.

As the weather was finally good Peter Leemker put a final coat of paint on the front door. More work was done outside: Fred van Arkel secured the rain pipes at the back of the building with braces, Pleun Punt cut the bramble down again and Fred van Arkel and Peter Leemker mounted two outdoor lights, one at the back and one at the side.

Club houseWednesday evening 15 August we packed our stuff at our old location. While Peter Heeren wonders about the junk we collected over the years, Pleun Punt and Fred van Arkel are busy packing. Club houseSome of the many boxes. About a third of our stuff went in the trashcan.
Club houseThursday evening Peter Heeren vacuums the room before he and Pleun Punt varnished the bar for the first time. Club housePeter Heeren applies varnish to the bar. Club houseThe bar after the first layer of varnish.
Club houseFriday Pleun Punt had attached a hook to a wall in the toilet. He put up a warning next to it for the next day ("Do not use today 18/8!"). Club housePeter Leemker waxed the floor in the workshop. Club housePeter Leemker and Pleun Punt have varnished the bar again.
Club houseSunday Fred van Arkel sanded the extra kitchen worktop. Club housePleun Punt repaired the wall, which was damaged while preparing it to be tiled last week. Club housePleun Punt also used duct tape proper: to lower the noise of the kitchens ventilation. Club houseFred van Arkel is busy routing a round corner on the extra kitchen worktop. Club housePeter Leemker painted the front door, including its bottom. Club houseFred van Arkel secures a rain pipe with a brace. Club houseFred van Arkel and Peter Heeren put up and connected this and another exterior light. Club housePleun Punt cut the bramble down again. Club houseThe workbench's legs were just between two floor beams thus it was jacked up to put support under the legs. Club housePeter Leemker finished the emergency lightings. Club housePleun Punt drills a large hole in the bar for the flex of the refrigerator. Club housePleun Punt removed masking tape from the floor. Club houseFred van Arkel also painted the uncovered parts of the extra kitchen worktop. Club housePeter Leemker applies an adhesive label to an emergency lighting.
Previous    NAVRO club house construction 27    Next