NAVRO club house construction 22
Alblasserdam, 15 July, 2007 - Wednesday 11 July we were to hold our first meeting in our new club house, so
Monday we made the final preparations to make it happen. Anti-scratch pads were put on the bar stool legs and one of the
refrigerators was placed. Meanwhile Harry Advokaat continued working on the bar. He routed a rounded side on the top of the
bar and sanded it with a surface sander.
Wednesday around noon Peter Heeren and Pleun Punt started making the shelves which are coming above the workbench in the
workshop. Peter Heeren finished the shelves later that week. Wednesday evening Harry Advokaat started making the foot
support of the bar. Arjen Plaizier prepared for making a concrete slope. We also held our first meeting in the club house
and the evening ended as usual with beer.
Saturday Louis Vinke of LV Belettering put special foil on the windows to reduce the heat getting in trough the windows.
While Pleun Punt grounded the shelves (and thereby running out of paint), Arjen Plaizier started making the slope for which
he prepared Wednesday. Pleun Punt also started making the corner part of the bar's foot support.
Sunday Pleun Punt finished grounding the shelves. Peter Leemker assisted by Pleun Punt shaved some length from the
underside of the internal doors, which were to low for the doormat. Meanwhile Fred van Arkel and Elco Lagendijk cut the
frame of the small workbench in two, as well as it's top, and attached it to the large workbench. After Pleun Punt finished
the foot support, he and Elco Lagendijk collected the oven from our old location and cleaned it. We needed it to determine
the height of the lowest shelf above the workbench. At the end of the day the shelves were painted the first
time.
Monday evening 9 July Arjen Plaizier hammers anti-scratch pads on the bar stool legs.
Gerben-Jan Ligthart unpacks one of the new refrigerators.
Harry Advokaat routs the side of the bar, while Pleun Punt holds the hose of the vacuum cleaner.
Harry Advokaat sands the side of the bar which he had just milled.
Wednesday around noon Peter Heeren is fixing rails for shelves to the wall of the workplace.
Peter Heeren saws the first shelf.
The first shelf.
Wednesday evening Harry Advokaat is making the bar's foot support.
Elco Lagendijk helps Harry Advokaat making the foot support.
Arjen Plaizier prepare for making a slope.
This evening was our first (improvised) club meeting in the new club house.
Which ended at the bar as usual.
Saturday we discovered Peter Heeren had finished making the shelves.
Louis Vinke of LV Belettering puts special foil on the windows to reduce the heat getting in trough the windows.
Pleun Punt grounded the shelves.
Arjen Plaizier makes a slope.
Pleun Punt continued the work on the bar's foot support.
A clever way to level the foot support.
Sunday Pleun Punt continued grounding the shelves.
Pleun Punt helps Peter Leemker shaving off some length from the underside of the doors.
Fred van Arkel cuts the frame of the small workbench in two.
Fred van Arkel saws the top small workbench.
Elco Lagendijk fixes the front to the small workbench.
Pleun Punt finished the bar's foot support.
Pleun Punt and Elco Lagendijk clean the oven, which they just collected from our old location.
At the end of the day Pleun Punt painted the shelves.