NAVRO club house construction 21
Alblasserdam, 8 July, 2007 - Monday 2 July our friend Peter laid the floors in the workshop and storeroom. Friday
6 July he came back to glue the doormat to the floor in the hallway. Wednesday 4 July before our usual evening we did some
small jobs, like cleaning up and working on the bar. Peter Heeren and Elco Lagendijk made the ceiling for the
fume-cupboard.
Thursday 5 July Harry Advokaat made supports on the front and back sides of the bar and brought one of the tables to the
club house. Saturday 7 July Pleun Punt painted the wooden backing of the coat-hooks and together with Arjen Plaizier he
touched up the walls in the hallway. Arjen Plaizier also shortened a piece of the floor support of the bar and fixed a
support to the floor.
Sunday 8 July Peter Leemker screwed the coat-hooks to the wall. Fred van Arkel touched up more walls. The workbench was
placed in it's definitive corner and the last and the right drawers were fixed again. Because the weather was good finally
Elco Lagendijk painted the frame of the front door a second time and the front door itself for the first time. Fred van
Arkel cut the grass between the large concrete slab and the smaller ones and laid some stones in that gap. Pleun Punt
removed paint from the windows. We also brought the chairs to the club house.
Monday 2 July our friend Peter worked his magic on the floor.
The floor in the workshop, with the doormat of the hallway to the left.
The storeroom has the same floor tiles as the workshop.
Wednesday evening 4 July Harry Advokaat continued working on the bar.
Peter Leemker cleaned up.
Peter Heeren and Elco Lagendijk worked on the fume-cupboard's ceiling.
Placing the ceiling in the fume-cupboard.
The fume-cupboard's ceiling.
Peter Leemker cleaned the hallway, because the doormat was to be glued to the floor on Friday.
Thursday 5 July Harry Advokaat made supports on front side of the bar.
As well as the back side.
Friday 6 July Peter glued the doormat to the floor in the hallway. It is weighted in the crucial places.
Saturday 7 July Arjen Plaizier shortened a piece of the foot support of the bar.
And fixed some part of the bar to the floor.
Pleun Punt painted the wooden backing of the coat-hooks and touched up together with Arjen Plaizier the walls in the hallway.
Sunday 8 July Peter Leemker finished the coat-hooks.
Fred van Arkel touched up badly painted parts on the walls.
The workbench was placed on it's definitive place and the right drawers were fixed again.
Elco Lagendijk painted the front door and the door frame.
Fred van Arkel cut the grass between the large concrete slab and the smaller ones.
And then laid some stones in the gap.
Pleun Punt removed paint from the window.
Meanwhile the chairs arrived.
At the end of the day Fred van Arkel, Elco Lagendijk en Gerben-Jan Ligthart enjoyed a drink at the new table and chairs.