NAVRO club house construction 18

Alblasserdam, 17 June, 2007 - Sunday 17 June Pleun Punt and Fred van Arkel painted the skirting boards in the workshop and hallway. Meanwhile Peter Leemker continued with the electrics, later assisted by the other two. Fred van Arkel also stripped down the smaller workbench, as it will be shortened 1 metre in length. We also collected ten bar stools.

Club houseSunday 17 June Pleun Punt painted the skirting boards in the workshop. Club houseFred van Arkel stripped down the smaller workbench, because it is to be reduced in length. Club houseThe almost completely stripped small workbench. Club housePeter Leemker makes the electrical connection to the boiler. Club houseFred van Arkel taped the skirting boards in the hallway. Club houseAnd also painted it. Club houseWe also collected ten bar stools. Club houseGerben-Jan Ligthart enjoys the first beer at the bar.
Previous    NAVRO club house construction 18    Next