NAVRO club house construction 18
Alblasserdam, 17 June, 2007 - Sunday 17 June Pleun Punt and Fred van Arkel painted the skirting boards in the workshop and hallway. Meanwhile Peter Leemker continued with the electrics, later assisted by the other two. Fred van Arkel also stripped down the smaller workbench, as it will be shortened 1 metre in length. We also collected ten bar stools.
Sunday 17 June Pleun Punt painted the skirting boards in the workshop.
Fred van Arkel stripped down the smaller workbench, because it is to be reduced in length.
The almost completely stripped small workbench.
Peter Leemker makes the electrical connection to the boiler.
Fred van Arkel taped the skirting boards in the hallway.
And also painted it.
We also collected ten bar stools.
Gerben-Jan Ligthart enjoys the first beer at the bar.