NAVRO club house construction 12

Alblasserdam, 2-6 May, 2007 - Wednesday evening 2 May we prepared the floor, as it was to be laid the following Saturday. So we hammered in some protruding nails, sanded rims flat and swept the floor. Meanwhile Vincent Kouer placed and connected the distribution board and electricity meter.
Saterday the floor was laid. The floor tiles have a light wood effect. It was very well done. We continued painting with a first layer of paint on all external parts of the door and window frames and primer on the front door. We also sanded the workshop.
Sunday 6 May we started with the electrics in the large room. Lighting was hung on the roof and tubes for the electric cables were fixed on the walls and roof. We painted the passage and the door and window frames for a second time. We also started painting the workshop.

Club houseWednesday evening 2 May we made the floor in the large room level and clean, because Saturday the floor tiles were to be laid. Club houseVincent Kouer connects the distribution board. Club houseVincent Kouer connects the electricity meter to the distribution board. Club houseIn the toilet a toilet roll holder and a soap dish were fixed. Club housePleun Punt fixes a hook for the door to the wall. Club houseThe hook and buffer for the door. Club houseFred van Arkel tries the placement of the lighting in the workshop. Club houseHarry Advokaat removed the stickers of the toilet furniture. Club houseThe distribution board and the electricity meter. We will remove the protective blue plastic when we are finished. Club houseThe distribution board. Club houseThe sun sets.
Club houseSaturday morning 5 May the floor was laid in the large room. Here we see some boxes of floor tiles. Club houseDistribution of the glue on the floor. Club houseThe first row of floor tiles. Club houseHalf of the floor is done. Club houseThe floor is almost ready. Club houseArjen Plaizier is preparing the window frames to be painted. Club houseFred van Arkel is painting a window frame. Club houseArjen Plaizier painted window frames too. Club housePainted window frames. Club housePleun Punt sanded the workshop.
Club houseSunday 6 May we started with the electrics. Peter Leemker is preparing the lighting. Club housePeter Heeren is fixing the lighting. Club houseLighting and tubes on the wall. Club houseFred van Arkel painted the window frames a second time. Club houseThe passage was painted a second time by Elco Lagendijk. Club houseWe also started painting the workshop.