NAVRO club house construction 9
Alblasserdam, 18-20 April, 2007 - Our contractor Dies van Iwaarden of Idis Klusbedrijf has been working hard last week. Al internal walls are completed and everywhere the skirting boards are fixed on the walls. Over the gaps between the wall panels and around the windows and doors thin decorative strips were fixed. All internal doors are placed. The kitchen units are placed and the walls around it were tiled, as was the toilet.
Wednesday 18 April Dies van Iwaarden, our contractor, had assembled the kitchen units.
The instructions of the kitchen units.
The urinal is already placed, or is it?
Thursday evening the doors were placed.
Today the boiler was placed en the taps and sinks were connected.
The tiles in the kitchen were just placed.
Dies van Iwaarden is tiling around the kitchen unit in the workshop.
The branches of the bramble we cut last month had grown back some 50 cemtinetres.
The tiles in the kitchen unit in the workshop were jointed Friday.
Just likes those in the kitchen unit behind the bar.
Last week the walls were finished with skirting boards (white) and decorative strips. To the right, in the corner, is a panel with paint for the walls and ceiling.
Dies van Iwaarden is tiling the floor of the toilet.
Fixing a decorative strip.
The toilet void of "furniture".