NAVRO club house construction 7

Alblasserdam, 3-4 April, 2007 - Due to circumstances the contractor couldn't work as much on the club house as planned. Nonetheless most of the floor was laid. The ventilation units and the pre-sawn parts of the bar are already delivered.

Wednesday evening 4 April we brought the heavy workbenches inside, because they are too big to be brought inside after the internal walls are erected. Since they were a few centimetres wide, we tilted them and brought them inside sideways. The biggest workbench however had drawers too close to it's legs. Without proper tools one set of drawers was removed and we finally got the workbench inside, but only just!

Club houseThe floor. Club houseThe floor seen from the other side. Club houseVentilation in the roof. Club houseA ventilation unit.
Club houseWednesday evening, Harry Advokaat looks how to remove the drawers. Club housePeter Leemker uses a pincer to remove a screw. Club houseBringing the big workbench inside. Club houseBoth workbenches.