NAVRO club house construction 6
Alblasserdam, 26-31 March, 2007 - Monday 26 March the roof was laid and later that week Idis Klusbedrijf started with the floor.
Friday 30 March we brought a pair of heavy workbenches from storage. They have to be brought inside before the internal walls are placed, because after that they are too big to go inside. Because the floor isn't ready yet they are outside under a canvas for the time being. We also have brought floor panels to the club house.
Wednesday the floor beams were placed.
The club house.
For reference: our current small room.
And the other side of our current room.
Construction drawings in the club house.
The floor beams took some force to get in place.
The floor beams with the insulation partly laid.
A corner of the club house with roof trimming and the rain water drain.
The rear side of the club house.
Friday evening we carried the floor panels closer to the building. Here we see Tim Houmes and Peter Heeren.
Fred van Arkel and Arjen Plaizier with a floor panel.
Kees Jan Groenendijk and Elco Lagendijk try to figure out how to get the workbenches out of the van.
A trailer was parked in front of our gate, which made it difficult to get the benches through the gate.
The front side of the club house with to the right under the white canvas the floor panels and workbenches.