NAVRO club house construction 1
Alblasserdam, 22 February, 2007 - The construction of our club house has finally started. Today the frame, on which the club house will be constructed, was made.
The next week will be used to make the connections for the sewer, electricity and water. Following that we will clear the site of rubble and trim the brambles. The actual construction will start on 19 March.
When we arrived on site, there were still some trailers.
But they were soon removed.
Gerben-Jan Ligthart inspects the concrete slab where the club house will be built on.
The contractor (Idis Klusbedrijf), Gerben-Jan Ligthart and the welder check the drawings.
Maat Transport delivered the steel beams.
The truck's crane was used to place the beams.
Carefull measuring.
The outline of the club house can be seen here.
Placing the final beam.
The first weld.
A little adjusting to make sure the beams are square.
The first corner.
A grinder is used to clean up the welds.
More welding.
A welding torch was used to cut off some excess beam.
The excess beam.
The completed frame.
The frame was amazingly level when we checked, even without raising some parts.
A hole was cut for the sewer pipe.